Avalon / CBRE

Length of Project: 14 Weeks Location: Leeds Size of Premises: 4 Toilet Blocks and 1 Shower

What Was The Client Looking For?

A high-end refurbishment of all the office block toilets with the additions of a shower area, all to be at a high end hotel standard design. To be completed without interrupting the use of toilets for the office block.

How Building Interiors Delivered What The Client Needed?

After winning the tender, we took the tender layout and developed in full to the high-end look and feel that the client was looking for. We added the shower area into the scheme and developed a program of works which allowed us to work alongside the busy office block without interruption. The scheme was successfully delivered in budget and to the set program.

Accero House

Full refurbishment including M&E works, decoration, partitions, flooring, breakout areas and meeting areas including a full furniture solution.

View case study

Looking for a free quote?