Length of Project: 16 Weeks Location: Hull Size of Premises: Various Areas - Over 5000 sq ft
ideal boilers
ideal boilers
ideal boilers
ideal boilers
ideal boilers
ideal boilers
ideal boilers
ideal boilers
ideal boilers

What was the client looking for?

Our client was bringing together numerous teams to work from one consolidated office to enable a more collaborative and efficient working environment. Training areas and meeting spaces were also required so these layout changes freed up the required spaces.

Scope of what was delivered?

Building Interiors delivered a full Fit-Out solution consisting of strip out, external windows and brickwork repairs, a full HVAC exposed ducting system, raised access floor, furniture along with all the usual trades. A new staff toilet block was also included in the scheme.

How Building Interiors delivered what the client needed?

Building Interiors complied with all idea boilers rigorous health and safety requirements. Through partnering with their on-site team we successfully completed all designs and installations as required.

HH Global

This project included: Ceilings, M&E Works, partitioning, decorating, bespoke joinery and collaboration features.