Our client tendered this project through CBRE and we were successful in developing the concept design to a full refurbishment including M&E works, decoration, partitions, flooring, breakout areas and meeting areas including a full furniture solution.
It was critical that the relocation of circa 130 staff was delivered on time in order for them to vacate their existing office.
Building Interiors successfully supplied and delivered all aspects of the project on-time, to budget whilst satisfying both CBRE and the tenant.
Our client wanted to maintain a strong brand identity for their office spaces, in line with their nationwide gyms. This included refurbishing and re-branding their Leeds offices initially, followed by various other locations, including their London HQ.